Stillwater Poolcraft
Get a quote
All services

Spring Pool Commissioning and Opening

Built for homeowners reopening their pool between March and May. We remove, wash, and fold the winter debris cover, reconnect disconnected pipework, recommission the pump and heater, and shock dose the water. The pool is brought up to circulation speed safely after months of winter rest.

£240per opening
Spring Pool Commissioning and Opening

What is included

  • ✓Winter debris cover removal, washing, and stowage
  • ✓Re-fitting plant room drain plugs and pressure gauges
  • ✓Pump priming and circulation verification
  • ✓Heater and heat pump ignition check
  • ✓Initial high-strength shock treatment
  • ✓Waterline descaling and scum band clean

Request a Service Visit

Tell us about your pool and we will confirm price and available dates.

Call back within one business day. Free consultation. No spam, no obligations.

How Our Visits Work

  1. 1

    Cover Removal and Storage

    We pump standing water off the winter cover, brush off debris, jet wash the fabric, and fold it away dry in your shed or garage.

  2. 2

    System Reassembly

    We reinstall winter plugs, refit pressure gauges, lubricate pump O-rings, and check all pipe unions for seasonal hairline cracks.

  3. 3

    System Priming and Start-Up

    We prime the filtration system, purge air from the pipe lines, and run the pump up to operating pressure.

  4. 4

    Recovery Shock Dosing

    We bring water chemistry up from winter dormancy with an oxidiser treatment to clear winter dampness and dormant spores.

Questions about this service

When is the best time to book a spring opening?

April is ideal for outdoor pools so the water does not warm up under the dark winter cover and feed dormant algae.

Will the pool be ready to swim immediately after the visit?

The water requires 24 to 48 hours of continuous filtration and chemical settling after initial shock dosing before swimming.

What if a pipe or valve leaks when you turn it on?

We isolate the circuit immediately, point out the worn part or perished seal, and quote for the replacement before proceeding.

What Pool Owners Say

★★★★★
Our outdoor pool suffered from cloudy water every time the oak trees dropped pollen. Julian arrived on time, sorted the sand filter, and the water has stayed clear all through summer.
Marcus B., Guildford, GB
★★★★★
The spring opening was handled cleanly. No mess on the York stone copings and the chemical balance was spot on. Highly recommend their bank transfer invoicing.
Eleanor P., Sevenoaks, GB
★★★★☆
Punctual weekly service. They vacuum the deep end thoroughly and always leave the plant room tidy. Reliable team.
David T., Tunbridge Wells, GB

Book your initial pool assessment

Send us a quick note about your pool size and what needs doing. We will call you back within three hours during regular working hours.